|
Quicklinks |
 |
|
|
 |
|
 |
|
 |
|
 |
|
Customer:
|
Furry Creek Power
|
|
Country:
|
Canada
|
|
Year of commissioning:
|
2004
|
|
In late December 2002, VA TECH HYDRO in Canada was awarded a contract by Furry Creek Power for the supply, technical direction and start-up and commissioning of the generating equipment for the Furry Creek hydroelectric plant situated near Squamish in British Colombia. The Furry Creek generating station will house one single vertical 4 jet Pelton turbine including a synchronous generator, inlet valve and electrical, control and protection equipment. The engineer is Sigma Engineering of Vancouver B.C.
|
|
Technical Data:
|
|
|
|
Output:
|
10,546
|
kW
|
|
Head:
|
326.5
|
m
|
|
Speed:
|
600
|
rpm
|
|
Runner diameter:
|
1,250
|
mm
|
|
|
|
 |