The scope of supply includes equipment for chip and bark handling, a complete fiberline (continuous cooking, washing, oxygen delignification, screening, and bleaching), the pulp drying line (wet end, dryer, cutter/layboy, and baling line), and the white liquor plant including kiln and recausticizing equipment. Start-up is scheduled for mid 2013.
The delivery encompasses the latest technology in woodyard equipment, a complete continuous cooking line and fiberline with an EFC bleaching plant, recovery boiler and evaporation plant, as well as the white liquor plant (kiln, recausticizing, including dregs washing/dewatering). Start-up is scheduled for late 2012.
3-loop deinking line with 550 t/d capacity to produce environmentally friendly copy paper and offset paper for Paper Machine No. 10, and higher quality copy paper for Paper Machine No. 9. Line uses American sorted office paper and local office waste paper to produce a deinked pulp with quality comparable to market pulp (up to 82% ISO). Start-up in 2009.
read more in Spectrum
The third line, designed for eucalyptus, started up April 2011. The pulp capacity of more than 2,000 admt/d, makes Sun Paper one of the largest mechanical pulp producers in China with the largest variety of raw materials. For all three lines, ANDRITZ MVR systems process the effluents, significanty reducing overall water consumption.
read more in Spectrum
Supply of complete OCC (old corrugated container) system for the production of coated testliner with a line capacity of 2,450 t/d. At start-up it will be the largest OCC line in the world. Start-up in 2012.
Largest order in ANDRITZ history involving the complete scope for building a modern 1.3 m t/a pulp mill (including civil/structural work, mechanical erection of equipment) for Stora Enso and Arauco. Providing the production equipment for the woodyard, fiberline, pulp drying plant, chemical recovery, and power island. Start-up scheduled for March 2013.
read more in Spectrum
Delivery of 140,000 t/a BCTMP mill, based on P-RC APMP technology. Full-line solution for mechanical pulp incl. woodyard, fiberline, dewatering, flashdrying, slab-press, baling line. The mill is among the most modern in the world, showcasing innovations like the installation of ANDRITZ TwinFlo low-consistency refiner to further reduce energy consumption. Start-up in 2006.
read more in Spectrum
EPC delivery of the woodyard, complete fiberline (cooking, washing, screening, and bleaching systems), pulp drying equipment and baling lines, as well as the white liquor plant with recausticizing and lime kiln. With the production of 1,600,000 t/a bleached eucalyptus, the mill will be the largest pulp mill in the world. Start-up in 2012.
Engineering, procurement, manufacturing of components and equipment for the EPC delivery of a greenfield pulp mill producing 700,000 t/a bleached hardwood pulp. Contract encompassed complete pulp line from woodyard to finished bales, chemical island (recovery island white liquor production plant and evaporators) and automation system. Start-up in 2011.
The installation of a new LC refiner at the mill is part of a public project to demonstrate dramatic reductions in energy demand for mechanical pulp production. The new, world’s largest low-consistency refiner, is a cooperative development between Holmen and ANDRITZ. Achievements could benefit TMP producers around the world. Start-up in 2008.
read more in Spectrum
Supply of a PowerFluid circulating fluidized bed boiler for the production of electricity and process steam at the Stora Enso Maxau mill, including TurboSorp dry flue gas cleaning system. The boiler plant burns a wide range of different fuels, including packaging derived fuel, wood, sludge and rejects, as well as coal as back-up fuel. Start-up in 2010.
Delivery of two identical biomass boilers, one for Cacia, one for Setúbal. The electric power output of the plants is 15 MWe each. The boilers are based on BFB technology and the fuel used (50 MW/unit) is mainly eucalyptus bark. Start-up in 2009.
read more in Spectrum
Supply of an EcoFluid bubbling fluidized bed boiler plant to the Palm Wörth mill in Germany. The boiler plant is used for the combustion of residues from the paper mills of the Palm Group and produces electricity and process steam for the paper production. The boiler plant burns a wide range of residues including rejects, fibre sludge, biomass sludge, deinking sludge as well as biogas from the purification plant. Start-up in 2008.
Scope of supply includes bubbling fluidized bed boiler island as well as erection work and commissioning. The boiler will burn wood-based fuels and generate steam at the rate of 195 t/h. The boiler’s design is based on ANDRITZ’s well-proven BFB technology combining high fuel efficiency with excellent environmental performance. Start-up in 2013.
Supply of bubbling fluidized bed boiler, fuel and bottom ash handling systems, and boiler safety system. The boiler is expected to make the Macon mill energy self-sufficient (electrical power and steam generation) which will reduce customer’s energy costs and dependency on fossil-fuel based alternatives. Start-up in 2013.
Supply of bubbling fluidized bed boiler, fuel feeding system and ash handling equipment for a CHP plant with a production capacity of 45 MW heat (for district heating) and 24 MW electricity. The biomass fuel is mostly forest and sawmill residues from local markets, and the remaining portion will be peat. Start-up in 2010.
read more in Spectrum
Supply of a 70 MW biomass boiler for one of Sweden’s largest biofuel-fired cogeneration plants. Scope includes 95 t/h steam boiler based on BFB technology; external fuel handling system; flue gas cleaning and flue gas condensing; process and building electrification; instrumentation; boiler safety system, and control system. Start-up in 2012.
World’s biggest sulfite liquor boiler plant, including a complete chemical recovery for the combustion of sulfite liquor and methanol as well as light fuel oil as back-up fuel. The steam parameters are 490° C, 86 bar and 270 t/h. Start-up in 2008.
Rebuild of paper machine press section, featuring the PrimePress Trix shoe press, that accelerates dewatering, considerably lowering the cost of production. Start-up in 2010.
read more in Spectrum
First PrimeLineCOMPACT plant on the Russian market: PrimeLineCOMPACT tissue machine with complete stock preparation for virgin fiber, PrimeDry Steel yankee and automation. Start-up in 2012.
more product information: Tissue machines
High-consistency peroxide bleach plant with post-bleach washing for groundwood. Coordination, cooperation, and communication – the successful elements for any capital project – require a commitment from both supplier and customer. Start-up in 2007. Highlight: Stora Enso’s bleach plant in Kvarnsveden, Sweden was brought online within 11 months for a new SC paper grade being produced at the mill.
read more in Spectrum
Complete OCC (Old Corrugated Containers) line incl. reject treatment for the new 455,000 t/y board machine, erection work, and start-up service. Final products are high-quality lightweight testliner and fluting. The reject treatment system designed for 120 t/d will supply combustible material for the existing power boiler. Start-up in 2013.
ANDRITZ delivered all production systems for the 400,000 t/a Kraftliner and linerboard machine: complete stock preparation plant, packaging paper machine, paper finishing equipment, complete plant automation. Start-up in 2009. Hebei could sell their products from the first paper on reel on!
read more in Spectrum
The project included the first ANDRITZ gap former. Testliner machine: Modification of the approach flow, new white water system, rebuild of wet section. PrimeFlow TW two-layer headbox with PrimeProfiler dilution water control and PrimeForm TW gap former. Start-up in 2010.
read more in Spectrum
Successful market introduction of the PrimeLineCOMPACT tissue plant concept: from stock preparation, tissue machine, and reel to automation. Start-up in 2008.
read more in Spectrum