Upper Maladugao, Philippines

Further success in the Philippines

Located in Bukidnon in Mindanao, Upper Maladugao is the first project from the Philippine Independent Power Producer United Holding Power Corporation.

© ANDRITZ

ANDRITZ Hydro Germany was awarded the contract for the supply of the entire electro-mechanical “from water-to-wire” package with three Compact Francis units. Local erection infrastructure, manpower and commissioning services for the equipment round out the contract.

© ANDRITZ

Technical Details

Total output:9.36 MW 
Scope:3 × 3.12 MW
Head:39 m
Speed:450 rpm
Runner diameter: 1,155 mm

Author: Michael Harbach

Contact us
HYDRO News Editorial Office
Eibesbrunnergasse 20
1120 Vienna
Downloads
  • Chichi Nanan 2 and Hoshan

    Chichi Nanan 2 and Hoshan

    PDF : 1.6 MB