Skip to main content
AdobeStock_892464080
© stock.adobe.com

Engineer the best business case for your Power-to-X plant, before you build it

ANDRITZ TEO™ techno-economic optimizer

P2X project success is determined long before construction starts. Decisions about electricity sourcing, electrolyzer sizing, storage capacity and plant integration can impact profitability for decades. 

TEO™ is an ANDRITZ in-house tool developed for holistic techno-economic optimization of P2X projects. It identifies the optimal plant configuration and operating strategy before engineering begins, helping you minimize production costs, reduce investment risk and maximize long-term project value. 

From €49,000

per study, fixed scope and price

2 weeks

from signed order to results

Confidential

by default, NDA on request

What you walk away with

  • A de-risked business case optimized for the lowest achievable LCOP (Levelized cost of product) and for maximum NPV / IRR
  • Optimized plant sizing for electrolysis, synthesis and storage
  • An optimized power strategy covering PPA, spot-market sourcing and dispatch
  • Production, plant utilization and GHG intensity per time interval (15 or 60 mins)
  • Preliminary CAPEX / OPEX at ±30% accuracy, including an RFNBO check
  • A preliminary basis of design providing a solid foundation for downstream engineering
ANDRITZ_research-and-development2

How TEO™ works

TEO™ combines your project-specific inputs with ANDRITZ engineering expertise to identify the optimal plant configuration and operating strategy. By evaluating both investment decisions and plant operation under real-world conditions, TEO™ helps you establish a technically sound and economically competitive Basis of Design before engineering begins.  

1. Define the project framework

Provide project-specific inputs such as power availability, production targets, market assumptions and regulatory requirements.

2. Optimize design and operation

TEO™ evaluates plant sizing, storage requirements, power sourcing and operating strategies to identify the strongest business case.

3. Move forward with confidence

Receive an optimized Basis of Design with the technical and economic foundation needed for investment decisions, FEED and detailed engineering.

See TEO™ in action

Step 1
Step 2
Step 3
Step 4
Step 5

Our other offering 

iStock-1310300600
© stock.adobe.com - westersoe.dk

EPC solutions for green hydrogen production

Converting renewable energy to green hydrogen.

AdobeStock_261968089
© stock.adobe.com

Harness the potential of e-methanol

ANDRITZ provides holistic and integrated solutions to produce e-methanol.

AdobeStock_858178827
© stock.adobe.com

Embrace the versatile market of e-ammonia

ANDRITZ provides holistic and integrated solutions to produce e-ammonia.